{"id":3987,"date":"2023-07-06T09:48:07","date_gmt":"2023-07-06T09:48:07","guid":{"rendered":"https:\/\/ndbim.eu\/?p=3987"},"modified":"2023-07-27T11:42:18","modified_gmt":"2023-07-27T11:42:18","slug":"enterprise-management","status":"publish","type":"post","link":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/","title":{"rendered":"The Next Step in BIM: Facility Management"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In recent years, there has been an enormous effort on the part of the Owners of Work (DO) to increase the importance of the operation and maintenance phase of buildings. This effort has also been made in terms of changing how the life cycle of a building is viewed, with regard to the costs of the different phases. According to some studies, only about 15% of the total costs of a building are applied in the construction phase. Not forgetting the huge effort on the part of the DO to reverse this scenario, it should be noted that there is still much to be done.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the following table, adapted from the BS ISO 15686-5:2008 standard, it is possible to verify that the construction of the building is just one of several costs inherent to the entire life of a building.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"238\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01.jpg\" alt=\"\" class=\"wp-image-3988\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01.jpg 800w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01-300x89.jpg 300w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01-768x228.jpg 768w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01-500x149.jpg 500w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM01-600x179.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption class=\"wp-element-caption\">Life cycle costs of a building (adapted BS ISO 15686-5:2008)<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The growing awareness of the importance of the operation and maintenance phase, which occupies about 80% of the total cost, leads to a need to manage the building after construction, thus emerging Facility Management (FM). FM is a resource management that combines people, physical location and process management experience in order to provide vital support services of the organization.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">FM core values<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Law Suit<\/strong><\/li>\n\n\n\n<li><strong>People<\/strong><\/li>\n\n\n\n<li><strong>Locations<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The progressive increase in the use of FM, together with the prominence that the Building Information Modeling (BIM) methodology has obtained in recent years, lead to the need to change the current approach to facility management. In this way, this type of management will be provided with the latest technological innovations such as the use of BIM.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Given that the BIM model is not just a three-dimensional model of the building, but an information repository of the entire building, the integration of the BIM methodology with FM becomes natural. Therefore, the BIM-FM methodology consists, very succinctly, in the application of Facility Management (FM) using the functionalities provided by the BIM model, either from the geometric model or from the database that contains all the necessary data of all elements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Implementation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The use of the FM methodology no longer represents doubts as to the value of its use and it is generally accepted and proven that the application of this methodology brings added value to your organization. However, despite the unanimity regarding the return on investment resulting from its application, when referring to BIM-FM, this is one of the issues that normally arises with its implementation.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Currently, some studies point to the validity of the financial return. However, ndBIM argues that each case should be analyzed individually, as there are several factors to be analyzed. Some of the factors that we consider indispensable in the analysis of each project are, for example: the type of project, the state of the project (new or existing), the existence of a BIM model, the use of some type of FM methodology and, in case of use, the existence and types of outsourcing contracts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More and more methodologies and tools are emerging that support and simplify this implementation process. One of the innovations that drives the integration of BIM-FM is the use of the Construction Operations Building information exchange (COBie), since this makes the integration even simpler and faster than the implementation of the FM methodology. This was included in the BIM implementation roadmap until 2016 in the United Kingdom, with the delivery of the building&#039;s COBie file being considered one of the minimum requirements.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">COBie is a standard for the exchange of information related to the building and its purpose is to exchange non-geometric information of the elements present in the model. The use of this tool encourages the collection and introduction of information in the model during the phases in which it is obtained, instead of the traditional process, where it is accumulated and gathered at the end. This posture does not lead to an additional cost, but rather to a change in the way information is gathered, representing an added value for the owner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For ndBIM, this is the best method of applying the BIM-FM methodology. In the situation represented, the implementation of the methodology does not present any type of additional cost for the owner in relation to the FM methodology, given the existence of both the model and the duly organized information, which together with the software license are the main costs of its implementation. On the contrary, the application of BIM-FM still finds advantages over FM, as it is not necessary to create specific information and 2D plans for the use of the FM tool.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For current users of the FM methodology, the switch to BIM-FM does not represent a sudden change in the way it is applied, but constitutes an evolution. Currently, there is an increasing number of FM applications that, not being BIM solutions, already allow their connection with BIM models. This option means that there is no loss of existing information, but rather a complement to it. This merger, in addition to the expected advantages of using BIM-FM, improves the management of changes, eliminates the need to repeat 2D CAD drawings and facilitates visualization through 3D.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another case that presents itself as one of the great examples of application are government properties and the fact that they have several assets in a concentrated region. Thanks to BIM-FM, it is possible to provide all information about properties and equipment, including their location and history, allowing maintenance teams not to be assigned to just one property. It makes it possible to transform these teams into units that can travel to any of the properties, whether or not they are familiar with them, with all the necessary information, thus admitting a reduction in the resources allocated to the task.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another advantage of using the BIM model is the possibility of energy simulations. Have you ever thought how much you could save on your energy bill by changing your building&#039;s coating? At a time when energy efficiency is the focus of attention and one of the main global concerns, the fact that the BIM model has the thermal properties of the materials, thus allows the energy simulation of the building without great effort or increased costs. The simulation results allow you to calculate the time to payback on your investment with great ease.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In order for our customers to better understand this BIM-FM implementation process, we chose to present a case study carried out by ndBIM in the application to a school centre.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"654\" height=\"369\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM03.jpg\" alt=\"\" class=\"wp-image-3989\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM03.jpg 654w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM03-300x169.jpg 300w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM03-500x282.jpg 500w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM03-600x339.jpg 600w\" sizes=\"auto, (max-width: 654px) 100vw, 654px\" \/><figcaption class=\"wp-element-caption\">School building under study<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Case study<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This building, already in operation, does not have any type of BIM model or management system. For this implementation it was decided to use ArchiCAD as modeling software and ArchiFM.net as BIM FM solution. This type of information is fundamental for the development of the implementation plan, which is divided into 4 phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Definition of requirements;<\/li>\n\n\n\n<li>Data collection;<\/li>\n\n\n\n<li>Center modeling;<\/li>\n\n\n\n<li>Integration with the BIM-FM solution.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM04.jpg\" alt=\"\" class=\"wp-image-3991\" width=\"220\" height=\"393\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM04.jpg 192w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM04-168x300.jpg 168w\" sizes=\"auto, (max-width: 220px) 100vw, 220px\" \/><figcaption class=\"wp-element-caption\">BIM-FM Implementation Process<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\">Definition of requirements<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When defining requirements, it is extremely important to define the purpose of the model to collect and model only what is really necessary. In addition to making the process longer, introducing unnecessary information into the model will only make it more cumbersome. Furthermore, the fact that the solution used for management is Software as a Service (SaaS), that is, a browser-based solution, making this option even more essential. For this Center, the following purposes were considered necessary:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Contract management;<\/li>\n\n\n\n<li>Maintenance;<\/li>\n\n\n\n<li>Stock management;<\/li>\n\n\n\n<li>Creation of performance indicators (KPI&#039;s) for benchmarking.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Data collection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At this stage, not only the collection of data related to the physical plant of the center was considered, but also the information necessary for its management. The information relating to the building is all in digital format and ends up representing the final screens of the building, currently known as As-Built.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Center modeling<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Modeling of the Center was carried out in accordance with the existing plans of the project. However, due to some changes made about which there is no information, it is necessary to verify these changes in the field, so that the model represents the current state of the building, as-managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When carrying out the modeling of the Centre, the information collected regarding the equipment was also inserted. Another precaution that must be taken into account when modeling is related to the specifications required for integration with the BIM-FM solution. The following image shows the model of building zones.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM05.jpg\" alt=\"\" class=\"wp-image-3992\" width=\"478\" height=\"286\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM05.jpg 618w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM05-300x180.jpg 300w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM05-500x299.jpg 500w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM05-600x359.jpg 600w\" sizes=\"auto, (max-width: 478px) 100vw, 478px\" \/><figcaption class=\"wp-element-caption\">Model of building zones<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\">Integration with the BIM-FM solution<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">After modeling the building and introducing the information into the components, it is synchronized with Archifm.net. After synchronization, the remaining information is inserted, this time using Excel sheets or directly in the application&#039;s browser.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From this point on, the entire management process is done in ArchiFM.net which, when necessary, is updated with the BIM model.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"502\" height=\"376\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM06.jpg\" alt=\"\" class=\"wp-image-3993\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM06.jpg 502w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM06-300x225.jpg 300w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM06-500x375.jpg 500w\" sizes=\"auto, (max-width: 502px) 100vw, 502px\" \/><figcaption class=\"wp-element-caption\">Synchronization between model and ArchiFM.net<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\">Benefits<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">With the implementation of this methodology, there are several expected advantages, varying according to the application cases. Some of these advantages are shown in the following figure.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07.jpg\" alt=\"\" class=\"wp-image-3994\" width=\"537\" height=\"534\" srcset=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07.jpg 672w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07-300x298.jpg 300w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07-150x150.jpg 150w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07-500x497.jpg 500w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07-600x596.jpg 600w, https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM07-100x100.jpg 100w\" sizes=\"auto, (max-width: 537px) 100vw, 537px\" \/><figcaption class=\"wp-element-caption\">Advantages of BIM-FM implementation<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">With technological evolution, the adaptation of the BIM-FM methodology by the Work Owners is a logical, natural and inevitable step. Initially, and in line with what happens with many other methodologies, there is an initial inertia to change on the part of some players in the sector.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is a methodology of extreme interest due to its potential for process optimization. While in the traditional process the management of facilities is a phase outside the rest of the construction process, with an abrupt transition between phases, with the use of this methodology, there is continuity between the different phases. This continuity allows greater functionality and usefulness of information for the Owner of Work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>If you think it&#039;s important to manage your building, why not bet on the evolution of FM?<\/strong>&nbsp;Get in touch with ndBIM, and we will be your partner in this implementation. Together we will define the best future for your organization.<\/p>","protected":false},"excerpt":{"rendered":"<p>The use of BIM in project management is beneficial in cost reduction, integration with FM and energy simulations.<\/p>","protected":false},"author":3,"featured_media":3996,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Carlota Lucas\"\/>\n\t<meta name=\"google-site-verification\" content=\"U3oQCzT7wIHCRcD0ZBZmX9T1bInKlLGdKPx0vyliX9E\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ndBIM Virtual Building - Creating value in everything we touch | Building Information Modeling (BIM)\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building\" \/>\n\t\t<meta property=\"og:description\" content=\"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"126\" \/>\n\t\t<meta property=\"og:image:height\" content=\"57\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-07-06T09:48:07+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-07-27T11:42:18+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building\" \/>\n\t\t<meta name=\"twitter:description\" content=\"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#blogposting\",\"name\":\"O Pr\\u00f3ximo Passo em BIM: Gest\\u00e3o de Empreendimentos - ndBIM Virtual Building\",\"headline\":\"O Pr\\u00f3ximo Passo em BIM: Gest\\u00e3o de Empreendimentos\",\"author\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"width\":1273,\"height\":1127},\"datePublished\":\"2023-07-06T09:48:07+00:00\",\"dateModified\":\"2023-07-27T11:42:18+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#webpage\"},\"articleSection\":\"Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en#listItem\",\"position\":1,\"name\":\"In\\u00edcio\",\"item\":\"https:\\\/\\\/ndbim.eu\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/category\\\/uncategorized\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#listItem\",\"name\":\"O Pr\\u00f3ximo Passo em BIM: Gest\\u00e3o de Empreendimentos\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en#listItem\",\"name\":\"In\\u00edcio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#listItem\",\"position\":3,\"name\":\"O Pr\\u00f3ximo Passo em BIM: Gest\\u00e3o de Empreendimentos\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/#organization\",\"name\":\"ndBIM Virtual Building\",\"description\":\"Creating value in everything we touch | Building Information Modeling (BIM)\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/\",\"telephone\":\"+351917663458\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ndbim\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/#author\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/\",\"name\":\"Carlota Lucas\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Carlota Lucas\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#webpage\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\",\"name\":\"O Pr\\u00f3ximo Passo em BIM: Gest\\u00e3o de Empreendimentos - ndBIM Virtual Building\",\"description\":\"O uso do BIM na gest\\u00e3o de empreendimentos \\u00e9 ben\\u00e9fico na redu\\u00e7\\u00e3o de custos, integra\\u00e7\\u00e3o com o FM e simula\\u00e7\\u00f5es energ\\u00e9ticas.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#mainImage\",\"width\":1273,\"height\":1127},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#mainImage\"},\"datePublished\":\"2023-07-06T09:48:07+00:00\",\"dateModified\":\"2023-07-27T11:42:18+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/\",\"name\":\"ndBIM Virtual Building\",\"description\":\"Creating value in everything we touch | Building Information Modeling (BIM)\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building","description":"The use of BIM in project management is beneficial in cost reduction, integration with FM and energy simulations.","canonical_url":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"U3oQCzT7wIHCRcD0ZBZmX9T1bInKlLGdKPx0vyliX9E","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#blogposting","name":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building","headline":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos","author":{"@id":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/#author"},"publisher":{"@id":"https:\/\/ndbim.eu\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","width":1273,"height":1127},"datePublished":"2023-07-06T09:48:07+00:00","dateModified":"2023-07-27T11:42:18+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#webpage"},"isPartOf":{"@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#webpage"},"articleSection":"Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en#listItem","position":1,"name":"In\u00edcio","item":"https:\/\/ndbim.eu\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en\/category\/uncategorized\/#listItem","name":"Uncategorized"}},{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en\/category\/uncategorized\/#listItem","position":2,"name":"Uncategorized","item":"https:\/\/ndbim.eu\/en\/category\/uncategorized\/","nextItem":{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#listItem","name":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos"},"previousItem":{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en#listItem","name":"In\u00edcio"}},{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#listItem","position":3,"name":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos","previousItem":{"@type":"ListItem","@id":"https:\/\/ndbim.eu\/en\/category\/uncategorized\/#listItem","name":"Uncategorized"}}]},{"@type":"Organization","@id":"https:\/\/ndbim.eu\/en\/#organization","name":"ndBIM Virtual Building","description":"Creating value in everything we touch | Building Information Modeling (BIM)","url":"https:\/\/ndbim.eu\/en\/","telephone":"+351917663458","sameAs":["https:\/\/www.linkedin.com\/company\/ndbim"]},{"@type":"Person","@id":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/#author","url":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/","name":"Carlota Lucas","image":{"@type":"ImageObject","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g","width":96,"height":96,"caption":"Carlota Lucas"}},{"@type":"WebPage","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#webpage","url":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/","name":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building","description":"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/ndbim.eu\/en\/#website"},"breadcrumb":{"@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#breadcrumblist"},"author":{"@id":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/#author"},"creator":{"@id":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#mainImage","width":1273,"height":1127},"primaryImageOfPage":{"@id":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/#mainImage"},"datePublished":"2023-07-06T09:48:07+00:00","dateModified":"2023-07-27T11:42:18+00:00"},{"@type":"WebSite","@id":"https:\/\/ndbim.eu\/en\/#website","url":"https:\/\/ndbim.eu\/en\/","name":"ndBIM Virtual Building","description":"Creating value in everything we touch | Building Information Modeling (BIM)","inLanguage":"en-US","publisher":{"@id":"https:\/\/ndbim.eu\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"ndBIM Virtual Building - Creating value in everything we touch | Building Information Modeling (BIM)","og:type":"article","og:title":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building","og:description":"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.","og:url":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/","og:image":"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png","og:image:secure_url":"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png","og:image:width":126,"og:image:height":57,"article:published_time":"2023-07-06T09:48:07+00:00","article:modified_time":"2023-07-27T11:42:18+00:00","twitter:card":"summary_large_image","twitter:title":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos - ndBIM Virtual Building","twitter:description":"O uso do BIM na gest\u00e3o de empreendimentos \u00e9 ben\u00e9fico na redu\u00e7\u00e3o de custos, integra\u00e7\u00e3o com o FM e simula\u00e7\u00f5es energ\u00e9ticas.","twitter:image":"https:\/\/ndbim.eu\/wp-content\/uploads\/2024\/11\/Site-B.png"},"aioseo_meta_data":{"post_id":"3987","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-11-29 18:17:43","updated":"2025-06-04 17:50:14","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ndbim.eu\/en\" title=\"In\u00edcio\">In\u00edcio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ndbim.eu\/en\/category\/uncategorized\/\" title=\"Uncategorized\">Uncategorized<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tO Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"In\u00edcio","link":"https:\/\/ndbim.eu\/en"},{"label":"Uncategorized","link":"https:\/\/ndbim.eu\/en\/category\/uncategorized\/"},{"label":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos","link":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/gestao-empreendimentos\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos | ndBIM Virtual Building<\/title>\n<meta name=\"description\" content=\"O crescente aumento da consciencializa\u00e7\u00e3o da import\u00e2ncia da fase de opera\u00e7\u00e3o e manuten\u00e7\u00e3o, que ocupa cerca de 80% do custo total, leva a uma necessidade de gest\u00e3o do edif\u00edcio ap\u00f3s constru\u00eddo, surgindo assim o Facility Management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ndbim.eu\/en\/2023\/07\/06\/enterprise-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos | ndBIM Virtual Building\" \/>\n<meta property=\"og:description\" content=\"O crescente aumento da consciencializa\u00e7\u00e3o da import\u00e2ncia da fase de opera\u00e7\u00e3o e manuten\u00e7\u00e3o, que ocupa cerca de 80% do custo total, leva a uma necessidade de gest\u00e3o do edif\u00edcio ap\u00f3s constru\u00eddo, surgindo assim o Facility Management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ndbim.eu\/en\/2023\/07\/06\/enterprise-management\/\" \/>\n<meta property=\"og:site_name\" content=\"ndBIM Virtual Building\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NDBIM\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-06T09:48:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-27T11:42:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mlzwvkdmlrq4.i.optimole.com\/cb:hOnc.4fa2c\/w:1219\/h:1080\/q:mauto\/f:best\/https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1273\" \/>\n\t<meta property=\"og:image:height\" content=\"1127\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Carlota Lucas\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ndBIM\" \/>\n<meta name=\"twitter:site\" content=\"@ndBIM\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carlota Lucas\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\"},\"author\":{\"name\":\"Carlota Lucas\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#\\\/schema\\\/person\\\/ebfa5f236d3b9998aee61133d434e5a9\"},\"headline\":\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos\",\"datePublished\":\"2023-07-06T09:48:07+00:00\",\"dateModified\":\"2023-07-27T11:42:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\"},\"wordCount\":1913,\"publisher\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\",\"name\":\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos | ndBIM Virtual Building\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"datePublished\":\"2023-07-06T09:48:07+00:00\",\"dateModified\":\"2023-07-27T11:42:18+00:00\",\"description\":\"O crescente aumento da consciencializa\u00e7\u00e3o da import\u00e2ncia da fase de opera\u00e7\u00e3o e manuten\u00e7\u00e3o, que ocupa cerca de 80% do custo total, leva a uma necessidade de gest\u00e3o do edif\u00edcio ap\u00f3s constru\u00eddo, surgindo assim o Facility Management.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"contentUrl\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/FM-object.jpg\",\"width\":1273,\"height\":1127},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/2023\\\/07\\\/06\\\/gestao-empreendimentos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/ndbim.eu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#website\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/\",\"name\":\"ndBIM Virtual Building\",\"description\":\"Creating value in everything we touch | Building Information Modeling (BIM)\",\"publisher\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#organization\"},\"alternateName\":\"ndBIM - O seu parceiro BIM\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ndbim.eu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#organization\",\"name\":\"ndBIM Virtual Building\",\"alternateName\":\"ndBIM Virtual Building\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Logo-novo-ideias_Prancheta-1-copia-4-copy-3.jpg\",\"contentUrl\":\"https:\\\/\\\/ndbim.eu\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Logo-novo-ideias_Prancheta-1-copia-4-copy-3.jpg\",\"width\":1146,\"height\":1146,\"caption\":\"ndBIM Virtual Building\"},\"image\":{\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/NDBIM\",\"https:\\\/\\\/x.com\\\/ndBIM\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ndbim\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ndbim.eu\\\/#\\\/schema\\\/person\\\/ebfa5f236d3b9998aee61133d434e5a9\",\"name\":\"Carlota Lucas\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g\",\"caption\":\"Carlota Lucas\"},\"url\":\"https:\\\/\\\/ndbim.eu\\\/en\\\/author\\\/carlota-lucasndbim-eu\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Next Step in BIM: Project Management | ndBIM Virtual Building","description":"The growing awareness of the importance of the operation and maintenance phase, which occupies around 80% of the total cost, leads to a need to manage the building after construction, thus giving rise to Facility Management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/enterprise-management\/","og_locale":"en_US","og_type":"article","og_title":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos | ndBIM Virtual Building","og_description":"O crescente aumento da consciencializa\u00e7\u00e3o da import\u00e2ncia da fase de opera\u00e7\u00e3o e manuten\u00e7\u00e3o, que ocupa cerca de 80% do custo total, leva a uma necessidade de gest\u00e3o do edif\u00edcio ap\u00f3s constru\u00eddo, surgindo assim o Facility Management.","og_url":"https:\/\/ndbim.eu\/en\/2023\/07\/06\/enterprise-management\/","og_site_name":"ndBIM Virtual Building","article_publisher":"https:\/\/www.facebook.com\/NDBIM","article_published_time":"2023-07-06T09:48:07+00:00","article_modified_time":"2023-07-27T11:42:18+00:00","og_image":[{"width":1273,"height":1127,"url":"https:\/\/mlzwvkdmlrq4.i.optimole.com\/cb:hOnc.4fa2c\/w:1219\/h:1080\/q:mauto\/f:best\/https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","type":"image\/jpeg"}],"author":"Carlota Lucas","twitter_card":"summary_large_image","twitter_creator":"@ndBIM","twitter_site":"@ndBIM","twitter_misc":{"Written by":"Carlota Lucas","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#article","isPartOf":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/"},"author":{"name":"Carlota Lucas","@id":"https:\/\/ndbim.eu\/#\/schema\/person\/ebfa5f236d3b9998aee61133d434e5a9"},"headline":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos","datePublished":"2023-07-06T09:48:07+00:00","dateModified":"2023-07-27T11:42:18+00:00","mainEntityOfPage":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/"},"wordCount":1913,"publisher":{"@id":"https:\/\/ndbim.eu\/#organization"},"image":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#primaryimage"},"thumbnailUrl":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/","url":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/","name":"The Next Step in BIM: Project Management | ndBIM Virtual Building","isPartOf":{"@id":"https:\/\/ndbim.eu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#primaryimage"},"image":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#primaryimage"},"thumbnailUrl":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","datePublished":"2023-07-06T09:48:07+00:00","dateModified":"2023-07-27T11:42:18+00:00","description":"The growing awareness of the importance of the operation and maintenance phase, which occupies around 80% of the total cost, leads to a need to manage the building after construction, thus giving rise to Facility Management.","breadcrumb":{"@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#primaryimage","url":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","contentUrl":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/FM-object.jpg","width":1273,"height":1127},{"@type":"BreadcrumbList","@id":"https:\/\/ndbim.eu\/2023\/07\/06\/gestao-empreendimentos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/ndbim.eu\/"},{"@type":"ListItem","position":2,"name":"O Pr\u00f3ximo Passo em BIM: Gest\u00e3o de Empreendimentos"}]},{"@type":"WebSite","@id":"https:\/\/ndbim.eu\/#website","url":"https:\/\/ndbim.eu\/","name":"ndBIM Virtual Building","description":"Creating value in everything we touch | Building Information Modeling (BIM)","publisher":{"@id":"https:\/\/ndbim.eu\/#organization"},"alternateName":"ndBIM - O seu parceiro BIM","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ndbim.eu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ndbim.eu\/#organization","name":"ndBIM Virtual Building","alternateName":"ndBIM Virtual Building","url":"https:\/\/ndbim.eu\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ndbim.eu\/#\/schema\/logo\/image\/","url":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/Logo-novo-ideias_Prancheta-1-copia-4-copy-3.jpg","contentUrl":"https:\/\/ndbim.eu\/wp-content\/uploads\/2023\/07\/Logo-novo-ideias_Prancheta-1-copia-4-copy-3.jpg","width":1146,"height":1146,"caption":"ndBIM Virtual Building"},"image":{"@id":"https:\/\/ndbim.eu\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/NDBIM","https:\/\/x.com\/ndBIM","https:\/\/www.linkedin.com\/company\/ndbim\/"]},{"@type":"Person","@id":"https:\/\/ndbim.eu\/#\/schema\/person\/ebfa5f236d3b9998aee61133d434e5a9","name":"Carlota Lucas","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5b0f797651a85f199f14898c691e823c8c27fe85b46812871fe1ceb06f85ea66?s=96&d=mm&r=g","caption":"Carlota Lucas"},"url":"https:\/\/ndbim.eu\/en\/author\/carlota-lucasndbim-eu\/"}]}},"_links":{"self":[{"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/posts\/3987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/comments?post=3987"}],"version-history":[{"count":2,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/posts\/3987\/revisions"}],"predecessor-version":[{"id":3995,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/posts\/3987\/revisions\/3995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/media\/3996"}],"wp:attachment":[{"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/media?parent=3987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/categories?post=3987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndbim.eu\/en\/wp-json\/wp\/v2\/tags?post=3987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}